In addition to the existing Steelshop Secondary Dedusting System's capacity of 1,085,000 m3/hour, a new filter system with a capacity of 1,610,000 m3/hour was added, bringing the total capacity to 2,695,000 m3/hour. In this way, higher standards have been achieved in terms of environment, occupational health and safety. In addition, charging hall hoods, which were not available before, were added to the system to prevent dust from escaping from the roof of the steelshop into the atmosphere. Erdemir Engineering contributed to the feasibility, planning, design, purchasing and project execution processes within the scope of the project. The project was put into operation on August 15, 2023.
Capacity | 1.610.000 Am3/h |
Filtration Area | 20.331 m2 |
Number of Bag Filters | 4.050 pieces |
Bag Filter Length | 10 meters |
Dust Conveying System | Pneumatic Blower |
Hood Design | Charging Floor Canopy System |
Sealing Design | Charging Floor and Tapping Floor are Isolated from Each Other |
Project Duration | 2.5 years (8 months Design 1.8 years Implementation) |
Commissioning | August 2023 |
Number of Contractors | 1 |
Max Personnel | 350 People 25-Person Design Team |