3.Pickling Line Self-dumping of Entry Scrap Box

Existing scrap disposal system causes HSE problem and has been created heavy workload for crane and line operators. A new scrap box design with self-dumping feature and higher carriage capacity was made at the entry shear of the line. Work within the scope of concept, detail design and technical drawing took 1 month and was completed in 2022.

Hedef Eliminating the working difficulties in terms of OHS in the existing scrap disposal system
Reducing crane and operator workload
Çözüm Designing a new scrap box with higher carrying capacity and self-dumping feature
Müşteriye Özel Providing a safe working condition in terms of OHS
Referans Erdemir Push-Pull Pickling Line,
3 months (1 month design + 2 months manufacturing and implementation),
Team: 2 Designers, 4-person Implementation Team,
Commissioning – 2022.